Property Service Act
Quiz Summary
0 of 10 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 10
1. Question
CorrectIncorrect -
Question 2 of 10
2. Question
CorrectIncorrect -
Question 3 of 10
3. Question
Join us for this CPD to mark the launch of the 2nd Edition SCSI Guide to Life Cycle Costing. This information paper was produced to educate members on the attributes of Life Cycle Costings and provides professionals with practical knowledge which will aid them in producing LCC models.
During the CPD we will discuss the meaning and applicability of LCC, the benefits to utilising a LCC approach and the challenges in the approach.
Speaker – Dermot Kehily MSCSI MRICS
Dermot has over 25 years’ experience in the Construction Industry, in both the United States and Ireland as a Quantity Surveyor, Construction Manager and in Project Controls, and as an academic in the School of Surveying and Construction Management in Technological University (TU) Dublin.
In 2007 he joined TU Dublin and is currently delivering modules on Quantity Surveying and Construction Management Programmes. Dermot has experience and has carried out extensive research in the areas of Digitisation in construction and Life Cycle Costing (LCC). Dermot completed a PhD in ‘Leveraging Building Information Modelling (BIM) for LCC’ in 2016 and collaborates with numerous BIM technology vendors, educating students and practitioners in digitisation and BIM.
1.0 CPD Hour
CorrectIncorrect -
Question 4 of 10
4. Question
Join us for this CPD to mark the launch of the 2nd Edition SCSI Guide to Life Cycle Costing. This guidance document was produced to educate members on the attributes of Life Cycle Costings and provides professionals with practical knowledge which will aid them in producing LCC models.
During the CPD we will discuss the meaning and applicability of LCC, the benefits to utilising a LCC approach and the challenges in the approach.
Speaker – Dermot Kehily MSCSI MRICS
Dermot has over 25 years’ experience in the Construction Industry, in both the United States and Ireland as a Quantity Surveyor, Construction Manager and in Project Controls, and as an academic in the School of Surveying and Construction Management in Technological University (TU) Dublin.
In 2007 he joined TU Dublin and is currently delivering modules on Quantity Surveying and Construction Management Programmes. Dermot has experience and has carried out extensive research in the areas of Digitisation in construction and Life Cycle Costing (LCC). Dermot completed a PhD in ‘Leveraging Building Information Modelling (BIM) for LCC’ in 2016 and collaborates with numerous BIM technology vendors, educating students and practitioners in digitisation and BIM.
1.0 CPD Hour
CorrectIncorrect -
Question 5 of 10
5. Question
Ticket
CorrectIncorrect -
Question 6 of 10
6. Question
Ticket
CorrectIncorrect -
Question 7 of 10
7. Question
Ticket
CorrectIncorrect -
Question 8 of 10
8. Question
Join us for this in-person CPD at Maynooth University.
The agenda will include:
- Platform & Sensor Technologies (Optical, LiDAR, Radar, Environmental)
- Flight Planning, Operations & Data Acquisition (Dos & Don’ts)
- Data Processing Workflows (including Data Quality) & Visualisation
- Sample Applications (Transportation, Utilities, Construction, Emergency Resposne etc
CorrectIncorrect -
Question 9 of 10
9. Question
Ticket
CorrectIncorrect -
Question 10 of 10
10. Question
CorrectIncorrect